A closer look at the Acid Washed Bricks
Weatherboards at the back has been installed
The Evaporative Cooling as well as the Heaters are also installed in the roof
The Permanent Front Door has been installed, with the glazed design though the colour is still not finalized
Going inside the house is a bit tricky now, as part of the inspection, we were accompanied by the the Site Super and had the chance to take some pictures inside the house. Plaster Boards on the 2nd Floor is almost complete.
The Master's Bedroom
The Activity Room
The Bath in the common toilet
The 1st Floor is still work in progress, you can see the insulation being placed between the frames and the Plaster Board
The Heating and Cooling Vents ...
The stairs will commence installation and targeted to be finished within 2 weeks ...
The scaffolding's are coming going down next week ... the Lock-up Stage is Complete, next Stop ... the Fixing Stage ...